Description: The station is located in the middle reaches of the Kashgar River Basin in Nileke County, XinjiangThe installed capacity is 460MW, and it is a dam-type power station. The dam is a concrete face rock-fill damwith a height of 157 meters and a crest length of 419 meters. The total storage is 25.30 bilion cubic meters, witha regulating storage capacity of 1.7 bilion cubic meters. The project commenced in April 2002 and completedquality supervision and final acceptance in August 2006 in a single stage. The construction period lasted 52months.